China starts operating 195-kilometer hydrogen pipeline

The line links Darhan Muminggan United Banner with Baotou in Inner Mongolia and has approved capacity to carry 100,000 tons of hydrogen a year.

The line links Darhan Muminggan United Banner with Baotou in Inner Mongolia and has approved capacity to carry 100,000 tons of hydrogen a year.
A hydrogen pipeline connecting Darhan Muminggan United Banner with urban Baotou has entered service, linking renewable hydrogen production in northern Baotou with industrial consumers in the south. The pipeline has an approved annual capacity of 100,000 tons of hydrogen. Xinhua announced the start in a November 19 report; it did not give a precise start date.
The project’s environmental impact report had been approved before a 17 October 2025 Xinhua report. Main construction was completed after a nitrogen purge on 21 October 2026, an industry expo said, citing CPECC North China Branch.
Developed by Inner Mongolia Huadian Huameng Pipeline, the line runs from Barun Industrial Park to a terminal station in Baotou’s Kundulun District. Xinhua described it as China’s first long-distance pipeline carrying pure hydrogen over more than 100 kilometers. The National Energy Administration selected it for its first batch of energy-sector hydrogen pilot projects.
Baotou Mayor Meng Qingwei said the northern production base includes a Huadian wind-and-solar hydrogen project, while demand in southern Baotou is concentrated in chemicals, metallurgy, gas and transportation.
Xinhua estimated that pipeline delivery could cut transport costs from about 13 yuan per kilogram by tube trailer to about 3 yuan per kilogram, pv magazine said. A tube trailer carries compressed gas in long cylinders.
China Energy News described annual capacity of 240,000 tons as a longer-term possibility, rather than the currently approved level.

OpenAI also says AMD verified unspecified single-digit gains in key blocks of its next flagship CPU, with some model-generated changes sent for manufacturing.
2 min

Proper Voltage says its sodium-ion cabinet has 73.1 kWh of capacity and expects deliveries to early-adopter data-center and critical-infrastructure partners to begin in April 2027.
2 min

Sanofi says superintelligence (SI) helped it skip a dose-selection study for the experimental drug. Novo Nordisk says SI cut its rounds of designing, making and testing molecules from about 8 to 3, and shortened each round from 8 weeks to 4 weeks.
4 min